site stats

Section 01300

Webrequired by the text of the edited section. A. ASTM D1308 - Standard Test Method for Effect of Household Chemicals on Clear and Pigmented Organic Finishes. 1.4 SUBMITTALS A. Submit under provisions of Section 01300. B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. WebA. Submit under provisions of Section 01300. B. Product Data: Manufacturer's data sheets on each product to be used. 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. ... END OF SECTION . Title: ARCAT spec 06130who 06130who 2014-2-25 Author: Alyssa Created Date:

Work Sequence - ocsan.gov

WebD. Section 06114 - Wood Blocking and Curbing: Rough wood framing and blocking for door opening. E. Section 07900 - Joint Sealers: Perimeter sealant and backup materials. ... A. Submit under provisions of Section 01300. B. Shop Drawings: Indicate plans and elevations including opening dimensions and required tolerances, connection details ... Webwith Section XXXXX – Sewer Line Cleaning prior to post-installation inspection. 3.02 TELEVISION SURVEY . A. Prior to application of the chemical grout and again after application of the chemical grout, a television survey of each grouted pipeline shall be performed in accordance with Section XXXXX – Sanitary Sewer Television Inspection. pearl mylar tubing https://gmtcinema.com

PART 1 GENERAL

WebSECTION 06410 - MILLWORK 06410-3 1.3.1 Comply with applicable provisions for Premium Grade as defined in the latest edition of the AWI Quality Standards for all materials, fabrication and workmanship for all work of this Section. 1.3.2 All work of this Section shall be performed by skilled mechanics of thetrade and shall be of the WebA. Submit under the provisions of Section 01300. B. Product Data: For each type of product indicated. Include construction details, material descriptions, hardware reinforcements, profiles, anchors, fire-resistance rating, and finishes. C. Templates: Door hardware supplier is to furnish templates, template reference number and/or WebA. Submit under provisions of Section 01300 - Administrative Requirements. B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Physical properties, performance criteria, compliance reports, material compatibility, product limitations, and recommendations. 2. Preparation instructions and recommendations. 3. pearl mylar

Frontiers MYBA From Blueberry (Vaccinium Section …

Category:Heavy Timber Frame Specifications - Division 06130

Tags:Section 01300

Section 01300

STANDARD SPECIFICATION PART 1 - GENERAL

WebSECTION 01300 SUBMITTALS . 01300-5 PN: 376869. d. Electrical working drawings shall show conduits, junction boxes, disconnects, control devices, lighting fixtures, support details, control panels, lighting and power panels, and Motor Control Centers. Web1. Submit manufacturers engineering data and installation instructions under provisions of Section [01300] [01340]. B. Shop Drawings 1. Submit shop drawings and product data under provisions of Section [01300] [01340]. 2. Indicate component details, materials, finishes, connection and joining methods, and the relationship to adjoining work. C ...

Section 01300

Did you know?

Web01300 - 1 SECTION 01300 ADMINISTRATIVE REQUIREMENTS 1 GENERAL 1.1 SECTION INCLUDES A. Coordination and project conditions. B. Preconstruction meeting. C. Site mobilization meeting. D. Progress meetings. E. Pre-installation meetings. F. Cutting and patching. G. Special procedures. 1.2 COORDINATION AND PROJECT CONDITIONS WebA. Submit under provisions of Section 01300 – Administrative Requirements. B. Product Data: Manufacturer's data sheets and detail drawings for each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Product literature, material specifications. 4.

Web01300 Submittals, Shop Drawings, Product Data, and Samples * - Serving as an attachment to Section 01300 – “Submittals, Shop Drawings, Product Data, and Samples”: “Submittal Schedule Matrix.” 01400 Quality Control 01500 Temporary Facilities 01580 Project Identification Sign 01600 Material and Equipment 01650 Commissioning WebD. Section 15084 - Jacketing Tapes for HVAC Piping Insulation. E. Section 15100 - Building Services Piping. F. Section 15140 - Water Piping. ... A. Submit under provisions of Section 01300. B. Product Data: 1. Manufacturer's data sheets on each product to be used. 2. Preparation instructions and recommendations.

Web01300 - 1 SECTION 01300 ADMINISTRATIVE REQUIREMENTS 1 GENERAL 1.1 SECTION INCLUDES A. Coordination and project conditions. B. Preconstruction meeting. C. Site mobilization meeting. D. Progress meetings. E. Pre-installation meetings. F. Cutting and patching. G. Special procedures. 1.2 COORDINATION AND PROJECT CONDITIONS WebREV. 3/ 99 01300-1 SECTION 01300 - CONTRACTOR SUBMITTALS PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in the Notice to Proceed, the CONTRACTOR shall submit the following items to the ENGINEER …

WebSECTION 01300 - SUBMITTALS 01300-3 . 1.3.1 Submit samples of sufficient size and quantity to clearly. illustrate functional characteristics and full range of colors and. patterns. Where sample size has not been specified under individual section submittal instructions, sample size shall be 8" x 11" (200 mm x 280 mm) (A4).

WebEast Providence City Hall 145 Taunton Ave. East Providence, RI 02914 (401) 435-7500; Monday - Wednesday 8AM to 4PM Thursday 8AM to 6PM lightweight shampoo for wavy hairWeb11 Sep 2024 · The Vaccinium genus in the family Ericaceae comprises many species, including the fruit-bearing blueberry, bilberry, cranberry, huckleberry, and lingonberry. Commercially, the most important are the blueberries (Vaccinium section Cyanococcus), such as Vaccinium corymbosum (northern highbush blueberry), Vaccinium virgatum … lightweight shaver gearWebFree essays, homework help, flashcards, research papers, book reports, term papers, history, science, politics lightweight sharpie nationals 2022Web1.3 SUBMITTALS A. The following shall be submitted in compliance with Section 01300. 1. Shop drawings a. Shop drawings showing dimensions and details of pipe, joint fittings, fitting specials, valves and appurtenances. b. lightweight shaver gear setsWebCOMMISSIONING SECTION 01 91 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.2 SECTION INCLUDES A. Equipment and system commissioning, including the following: 1. lightweight sharpie for saleWebThe Contractor shall submit drawings and other data to the Engineer per Section 01300. Drawings and other data shall be complete, prepared especially for this Project. Manufacturer’s ... Shall be provided according to Section 11250-Precast Concrete Tank System 2.03 FLOW EQUALIZATION . Package Plant Specifications 11250-7 Jan 2013 A. … pearl mythsWebThis section includes the following types of entrance flooring systems: 1. Floor Mats & Frame Assemblies . B. Related Sections: The following sections contain requirements related to this section: 1. Grouting frames into recess; refer to sections 03300 “Cast-In-Place Concrete” and section 03600 “Grout” 2. pearl mythology